signature towers
Latest from signature towers
Heavy rain, traffic snarls hold Gurugram hostage
Waterlogging, coupled with a road cave-in at Shankar Chowk and trees getting uprooted at two locations, slowed traffic movement between 8am and 10am.m

Gurugram traffic lights likely to return at key junctions on e-way
Traffic signals were removed from the three junctions after an underpass was constructed at each of these points in 2017-18 by the National Highways Authority of India (NHAI).

Truck breaks down, triggers 4.7-km traffic jam on e-way
With the truck remaining stationery, vehicular movement started getting hampered, especially between 9am and 10.30am, peak traffic hours, resulting in a 4.7 kilometre snarl between Rajiv Chowk and Signature Towers.

Friday rain leads to road cave-ins at three spots near MDI Chowk
GMDA officials blame DHBVN for not carrying out thermal contraction; power discom cites road widening, civic work

Mock drill will check whether underpasses ready for rains
In August last year, the Hero Honda Chowk underpass was closed for more than 50 hours after the GMDA’s motor pumps had failed to drain the rainwater.
