close_game
close_game

Contractors staying away from Mangi bridge project: PWD

Apr 16, 2025 05:24 AM IST

The arches of the bridge were last repaired by the Archaeological Survey of India (ASI) in August 2024, after it was damaged by a container truck that got stuck under it

New Delhi

It will take two months and a cost of <span class='webrupee'>₹</span>21.7 lakh to install the heavy-duty barriers. (HT Archive)
It will take two months and a cost of 21.7 lakh to install the heavy-duty barriers. (HT Archive)

The Public Works Department (PWD) said on Tuesday it has been unable to find a suitable contractor to install height barriers around the Mangi bridge, a historic structure that connects the Red Fort and Salimgarh Fort on the Outer Ring Road (ORR), to curb the entry of large vehicles and safeguard the structure.

The arches of the bridge were last repaired by the Archaeological Survey of India (ASI) in August 2024, after it was damaged by a container truck that got stuck under it.

“The arches are already very old and have been broken because of multiple hits by heavy vehicles. The contractors are a bit apprehensive as the space is already less and any groundwork to install the barrier will also need to be very carefully done to avoid any vibrations,” a PWD official said.

Since March, the PWD has invited contractors thrice for the project, but to no avail. The old and dilapidated structure also needs architectural experts to oversee the project, officials said.

According to the PWD, it will take two months and a cost of 21.7 lakh to install the heavy-duty barriers.

There is heavy traffic movement around the Mangi bridge from the Kashmere Gate interstate bus terminal (ISBT), as traffic flow from northeast Delhi converges with the Ring Road here. The bridge, over a century old, is protected by the ASI. The bridge has three arches, each with two lanes underneath. A similar approach of using a height barrier was used at the ASI-protected Tripolia Gate before.

The bridge has needed repairs every couple of years and a major restoration was carried out before the Commonwealth Games in 2010, with the help of a team from the United Kingdom. A PWD official said that the arch of the bridge is tall enough for trucks to safely pass under, but the problem arises when trucks are overloaded.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
SHARE THIS ARTICLE ON
SHARE
Story Saved
Live Score
Saved Articles
Following
My Reads
Sign out
New Delhi 0C
Wednesday, May 07, 2025
Follow Us On