mmrda
PAGE 3
Latest from mmrda
After years of delay, SCLR-WEH extension may open in May
The Santacruz Chembur Link Road extension is 95% complete, with hopes for a May opening, easing traffic from eastern to western suburbs in Mumbai.

After Elphinstone, Sewri PAPs too demand in-situ rehab
The Prabhadevi two-deck flyover is part of the 4.5-km Sewri-Worli elevated corridor, which aims to connect the Atal Setu with the Bandra-Worli Sea Link

Protestors stall Elphinstone bridge closure; govt to meet on Monday
Many parents who were part of the protest expressed concern about the additional travel time to schools and hospitals, the bridge’s closure will bring

Tunnel breakthrough achieved on metro line 7A; 22 km route to be readied in 2025
Mumbai's Metro Line 7A reached a milestone with a tunnel breakthrough, enhancing connectivity from Mira-Bhayander to the airport, 59% complete.

Mumbai Metro 2B trial runs to begin on Wednesday
The trial runs will start on a a 5.3-km section of the route between Mandale in Mankhurd and Diamond Garden in Chembur
