Residents say municipal corporation employees never pay visit to listen to their grievances.
Even after the rain on July 2, water had entered shops and houses due to blockage in road gullies, which are further connected to the sewer line. Blockage in these road gullies persists as some people throw garbage on roadsides, which gets collected here. Besides, there is a need to construct more road gullies.
Shopkeepers alleged that problem has worsened after the construction of flyover around five years ago. As the drainage pipes from the flyover are not connected to the sewer line, rainwater gets collected on Link Road, thus flooding the area.
Shutters of most of the shops remain closed whenever it rains.
MC superintending engineer Rajinder Singh said there is no storm drainage system. We will find out a permanent solution to the problem of waterlogging soon, he said.
News/Cities/Others/ Chronic waterlogging V: No drainage system, no end to rain misery in Dashmesh Nagar